All Posts Tagged With: "First Solar"

post thumbnail

G.E. to Build Largest Solar Manufacturing Plant
in the United States

The manufacturing giant’s connections to Colorado may bode well for locating the panel factory here. It acquired Arvada-based PrimeStar Solar Inc. to gain entry into the thin film PV market, and NREL certified that company’s panels as the most energy efficient of their kind.

8Apr2011 | admin | 1 comment | Continued
post thumbnail

ProLogis Unveils Rooftop Photovoltaic Test Site
in Denver

The site totals 11 kWp of power generation capacity, and the design/build envelope relied on products and services provided by several Colorado-based companies including Ascent Solar, Colorado Moisture Control, Howard Electric, S.A. Miro and SMA America, LLC.

19May2010 | admin | 0 comments | Continued
post thumbnail

State Solar Tracks
Noteworthy Installs But a Big One is Dropped

While the CSU installation in Fort Collins and newly commissioned PV system for Alamosa High School were celebrated, news of First Solar dropping its 150 Mw utility-scale project in the San Luis Valley cast doubt in some quarters on the viability of such developments.

23Dec2009 | admin | 0 comments | Continued


  • SPONSORED LINKS

    RASEI
    Renewable & Sustainable Energy Institute
    Colorado Real Estate
    Search homes on COhomefinder.com
    Earth Protect
    From Image To Action
  • Newsletter Subscription

    Get Colorado Energy News and alerts as they happen: