All Posts Tagged With: "First Solar"
G.E. to Build Largest Solar Manufacturing Plant
in the United States
The manufacturing giant’s connections to Colorado may bode well for locating the panel factory here. It acquired Arvada-based PrimeStar Solar Inc. to gain entry into the thin film PV market, and NREL certified that company’s panels as the most energy efficient of their kind.
8Apr2011 | admin | 1 comment | ContinuedProLogis Unveils Rooftop Photovoltaic Test Site
in Denver
The site totals 11 kWp of power generation capacity, and the design/build envelope relied on products and services provided by several Colorado-based companies including Ascent Solar, Colorado Moisture Control, Howard Electric, S.A. Miro and SMA America, LLC.
19May2010 | admin | 0 comments | ContinuedState Solar Tracks —
Noteworthy Installs But a Big One is Dropped
While the CSU installation in Fort Collins and newly commissioned PV system for Alamosa High School were celebrated, news of First Solar dropping its 150 Mw utility-scale project in the San Luis Valley cast doubt in some quarters on the viability of such developments.
23Dec2009 | admin | 0 comments | Continued
